home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V10_4 / V10_425.ZIP / V10_425
Internet Message Format  |  1991-07-08  |  19KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from beak.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/IZg1s7y00VcJQ=Gk5D>;
  5.           Sun, 14 Jan 90 01:36:56 -0500 (EST)
  6. Message-ID: <IZg1rlS00VcJQ=F04X@andrew.cmu.edu>
  7. Reply-To: space+@Andrew.CMU.EDU
  8. From: space-request+@Andrew.CMU.EDU
  9. To: space+@Andrew.CMU.EDU
  10. Date: Sun, 14 Jan 90 01:36:35 -0500 (EST)
  11. Subject: SPACE Digest V10 #425
  12.  
  13. SPACE Digest                                     Volume 10 : Issue 425
  14.  
  15. Today's Topics:
  16.             Re: Nuclear Reactors in Space
  17.              Re: Airlocks & Life support
  18.               Galileo Update - 01/12/90
  19.           Any NASA COBE Personnel Out There?
  20.             Re: Nuclear Reactors in Space
  21. ----------------------------------------------------------------------
  22.  
  23. Date: 13 Jan 90 23:01:25 GMT
  24. From: microsoft!davidle@uunet.uu.net  (David LEVINE)
  25. Subject: Re: Nuclear Reactors in Space
  26.  
  27. In article <1990Jan8.151837.6831@utzoo.uucp> kcarroll@utzoo.uucp
  28. # (Kieran A. Carroll) writes:
  29. #Ha!  You've gotta be kidding.  RTG's are NOOOKLIER,
  30. #made of ATOMS just like ATOMIC BOMBS.
  31.  
  32. Isn't that NOOOKULER?
  33.                 ^
  34. #
  35. #It's an unfortunate fact of life that there are a number of people out
  36. #there who react to any mention of the "N-word" with mindless,
  37. #unreasoning, superstitious dread, and no arguments, no matter how well
  38. #reasoned and firmly based in fact, will sway them in the slightest.
  39. #
  40. #(I have heard some reasoned, though, in my opinion, quite mistaken
  41. #arguments against nuclear power.  Tim's wild-eyed paraoid rantings
  42. #against anything containing the "N-word" are not among them.)
  43.  
  44. Its been this way for a long time and there are good reasons for the
  45. paranoia.  Back in 1950 when the US was sitting on top of the world,
  46. atomic power was going to save mankind.  A pamphlet entitled
  47. "Operation Atomic Vision" promised that atomic power would solve all
  48. of our problems -- there would be no hunger and no disease and everybody
  49. would be happy.  This was the official word from the Atomic Energy Commision.
  50.  
  51. Well, it didn't happen.  In fact, the whole thing has been one big
  52. mess.  We jumped in too far too fast without really understanding the
  53. dangers.  In all sorts of small ways, the fledgling commercial
  54. nuclear industry was subsidized by the government and was not
  55. competitive on its own.  The construction and operation of the plants
  56. has often been done with abysmal standards.  An "N" plant is
  57. reasonably safe if built and operated to spec and a potential
  58. disaster if not.  It has not been treated with the seriousness it
  59. deserves.  Of course, the study of nuclear physics has provided many
  60. other practical improvements to the quality of our life besides
  61. nuclear energy.
  62.  
  63. The defense agencies were worse.  They did not protect the public or
  64. their own personel from the hazards of above ground testing.  The
  65. mistakes and cost cutting measures in the nuclear facilites has resulted
  66. in the horrible mess we see today trying to clean up old sites and
  67. get rid of waste products.
  68.  
  69. For YEARS (and perhaps still today), when ordinary citizans questioned what
  70. was going on, they were rebuffed, lied to, or ignored.  Sometimes, they
  71. were harrassed by public and private entities whose toes they stepped on.
  72. It was not possible to put a leash on the companies that built and
  73. operated the plants and especially not on the military.
  74.  
  75. Slowly, the public became aware of the dangers and started providing
  76. support for the few individuals who had earlier been fighting alone. 
  77. Three Mile Island greatly increased the momentum.  The huge backlash
  78. has contributed to the construction of new plants grinding to a halt.
  79.  
  80. This new grass roots army of anti-nuclear activists usually fits the
  81. bill of reacting to the "N-word" with "mindless, unreasoning, superstitious
  82. dread."  These people are not scientists (not even computer scientists #:->).
  83. However, they know they have been lied to.
  84.  
  85. I used to love looking at anti-nuclear literature and poking huge holes
  86. in it, both techinical and historical.  The biggest anti-nuclear
  87. organizer on campus admitted that much of the literature he passed around
  88. (he got it from an umbrella organization) was bogus, but people believed
  89. it and supported the cause and that was the important thing.
  90.  
  91. You don't get a mass movement by painting the problem in shades of grey,
  92. that is partly why (IMHO) you see so many anti-nuclear fanatics.
  93.  
  94. This has basically killed the future of the nuclear industry and has led
  95. to things like the recent RTG incident.  "But the *scientist* say that
  96. the RTGs are safe to launch" you say.  Those same scientists also
  97. said that above ground nuclear tests were OK.  There is a big
  98. credibility gap here.
  99.  
  100. By the way, I worked on Galileo for six year while at JPL.  I am quite glad
  101. it went up, thank you.  I'm just trying to justify the seeming insanity
  102. of the Christics and others.  Someone suggested that their motivation was
  103. simply to disrupt large organizations.  This is a bit hard to swallow.
  104.  
  105. John Q. Public is not an expert in risk analysis or statistics.  The
  106. Galileo launch *was* a quantifiable risk to the residents of southern
  107. Florida.  Many people just don't understand the comparison to other routine
  108. risks (like slipping in the shower or driving over a bridge which might
  109. collapse).
  110.  
  111. DISCLAIMER:  I think nuclear technology is great stuff.  The commercial
  112. and military nuclear industries are another story entirely however.
  113. I would not want an N plant near my house, nor would I want a
  114. chemical plant or an IC fabrication facility.  Yet my modern life
  115. is based on energy, chemicals and computers.  Yes it is hypocritical.
  116. We must anticipate and pay for the *future* costs of our technology
  117. in order to safeguard everybody.  It certainly will cost more now but
  118. will save magnificently over the long haul.
  119.  
  120. Sorry, this does not really belong in sci.space, but space scientists must
  121. also understand the social implications of their work.  We will see more
  122. RTG-like incidents in the future.  We must treat those who question the
  123. safety of our pursuits seriously, sometimes they are right!  I don't
  124. mean we should cater to them, but if you brush off one activist like a fly
  125. they will return in hoards.
  126.  
  127. David Levine
  128.  
  129.  
  130. =====================================================
  131. === The opinions expressed above are entirely mine ==
  132. === The facts expressed above are probably wrong   ==
  133. =====================================================
  134.  
  135. ------------------------------
  136.  
  137. Date: 13 Jan 90 07:51:39 GMT
  138. From: att!watmath!watserv1!utgpu!utzoo!henry@ucbvax.Berkeley.EDU  (Henry Spencer)
  139. Subject: Re: Airlocks & Life support
  140.  
  141. In article <11704@csli.Stanford.EDU> jkl@csli.stanford.edu (John Kallen) writes:
  142. >I've often wondered what happens tro the air in the airlocks when 
  143. >cosmonauts perform EVAs...
  144.  
  145. On all US spacecraft, and I'm pretty sure on all Soviet ones, it's simply
  146. dumped.  So far, the mass costs of doing something about it are too high
  147. to be worth it, given that EVAs are infrequent and air compressors are
  148. heavy.
  149.  
  150. >... Is air sucked out of the airlock prior to the
  151. >opening of the outer hatch before EVA exit, or is it dumped in space when
  152. >the hatch opens? 
  153.  
  154. It's vented through a valve before opening the hatch.  A reasonable fraction
  155. of one atmosphere exerts a good many thousands of pounds of pressure on
  156. a normal-sized hatch; one does not want to just unlatch something holding
  157. back that much force.  Some of the hatches are designed to exploit that
  158. pressure, in fact, to give a better seal:  if the hatch opens inward,
  159. air inside holds the hatch very firmly against the gaskets.  (This is
  160. also a minor safety feature, in that the hatch cannot be opened by
  161. accident with air inside.)  As I recall, both hatches on the shuttle
  162. airlock open inward.
  163.  
  164. >... Is the
  165. >evacuation of the airlock the activity that makes EVAs so lengthy timewise?
  166.  
  167. No.  The EVAs themselves are lengthy because work in free fall while wearing
  168. a clumsy suit is difficult.  Preparation for them is lengthy because keeping
  169. the suits' clumsiness to a minimum requires running with an absolute minimum
  170. of pressure in them.  To do that, one has to run the suits on something
  171. approaching pure oxygen.  For various reasons, current preference is to
  172. run spacecraft cabins at near one atmosphere and use a near-normal mix
  173. of oxygen and nitrogen.  The transition from a high-pressure atmosphere
  174. rich in nitrogen to a low-pressure one requires lengthy pre-breathing
  175. of pure oxygen to get the nitrogen out of the astronauts' bodies.  (The
  176. alternative is a strong possibility of decompression sickness, "the
  177. bends", potentially crippling or fatal, as that nitrogen comes out of
  178. solution as bubbles.)  There has been a lot of talk about high-pressure
  179. suits, but getting adequate joint flexibility is difficult.
  180.  
  181. >... how often does MIR need to be "refueled"
  182. >with air when it is manned? How long can they survive only by recycling with 
  183. >LiOH(I think?) before they absolutely need more oxygen...
  184.  
  185. LiOH takes CO2 out of the air, but it does not restore oxygen.  A constant
  186. trickle of oxygen is required.  Without it, survival time is determined by
  187. how much oxygen there is in the air filling Mir... which is not a lot,
  188. sizable though Mir is.
  189. -- 
  190. 1972: Saturn V #15 flight-ready|     Henry Spencer at U of Toronto Zoology
  191. 1990: birds nesting in engines | uunet!attcan!utzoo!henry henry@zoo.toronto.edu
  192.  
  193. ------------------------------
  194.  
  195. Date: 13 Jan 90 18:27:55 GMT
  196. From: zaphod.mps.ohio-state.edu!usc!elroy.jpl.nasa.gov!jato!mars.jpl.nasa.gov!baalke@tut.cis.ohio-state.edu  (Ron Baalke)
  197. Subject: Galileo Update - 01/12/90
  198.  
  199.  
  200.              Galileo Mission Status Report
  201.                 January 12, 1990
  202.  
  203.      As of Friday, January 12, 1990, the Galileo Spacecraft is 16,229,650
  204. miles from the Earth, 11,067,810 miles from Venus and was travelling at a
  205. Heliocentric velocity of 73,900 miles per hour.  Round trip light time is
  206. 2 minute, 52 seconds.
  207.  
  208.      Two SITURNS to the Sun were successfully performed without incident
  209. on January 9 and January 12. A total of 1151 real-time commands have been
  210. transmitted to Galileo.  Of these, 845 have been pre-planned in the
  211. sequence design and 306 were not.  In the past week a total of  61 real-time
  212. commands were transmitted; 1 was pre-planned and 60 were not.  To date a
  213. total of 120 contingency commands have been generated and 4 contingency
  214. commands have been transmitted; none were transmitted this week.  This weeks
  215. totals contain 10 commands from EV-05.
  216.  
  217.      The EV-5 sequence memory load was successfully loaded into the CDS on
  218. January 6.  As part of the load process, elements 212 and 213 of the load
  219. were not received initially and had to be retransmitted.  Preliminary
  220. analysis discovered the CDS had experience eight lock change indications
  221. as detected by the HCD. Investigation into the cause of these lock changes
  222. is in process by systems, CDS and telecom personnel.  The EV-5 sequence
  223. went into operation, as planned, on January 8. The events in EV-5 will
  224. cover spacecraft activities through February 5.
  225.  
  226.      As part of the investigation into the EUV microprocessor "stop"
  227. anomaly, which occurred during the science checkout activity, the EUV
  228. memory was loaded and readout twice on January 6.  Subsequent to memory
  229. verification, the EUV microprocessor was started on January 8. Memory
  230. readouts were performed prior to and after the microprocessor start and
  231. operation of the EUV was nominal.  The exact cause of the anomaly which
  232. stopped the microprocessor has not been determined.  However, it is unlikely
  233. based on this data that a "hard" failure has occurred in a 6504 memory chip.
  234.  
  235.      The sixth RPM thruster "flushing" activity was successfully completed
  236. on January 8.  Only the Z, L and S thrusters were "flushed".  Since the P
  237. thrusters are used for periodic SITURNS they were not "flushed" during this
  238. activity.  The temperature profiles for the Z, L, and S thrusters were as
  239. expected and ranged from a peak temperature of about 50 degree C to 100
  240. degree C, well within the predicted limits.
  241.  
  242.      A command was sent on January 9 to turn off the NIMS shield heater
  243. (26W) for about 3 hours to permit the NIMS to collect Focal Plane Assembly
  244. Temperature data in an attempt to ascertain whether the NIMS radiator
  245. cover was deployed or not.  After 3 hours, the heater was turned on again
  246. consistent with RPM thermal/pressure constraints. Data collected by the
  247. NIMS during the time the heater was off indicated the cover was either
  248. already deployed or that it deployed as a result of the cool down possibly
  249. relaxing any mechanical binding which may have existed.
  250.  
  251.      The delta DOR function in the RFS was activated for the first time on
  252. January 9.  Delta DOR represents a navigation new data source in addition
  253. to doppler and ranging data already available.  Demonstration of the S-Band
  254. delta DOR is being performed now while the RF link performance is still
  255. "strong" and to allow sufficient time to understand and evaluate the DOR
  256. data and its actual advantages to navigation.  The S-Band delta DOR consists
  257. on modulating the downlink carrier with a 3.82 MHZ sine wave.  It is pointed
  258. out that during the short periods that delta DOR is active, the telemetry
  259. data stream from the Telemetry Modulation Unit is interrupted and no
  260. spacecraft data is transmitted.  Estimates indicate that a 2-3 kg fuel
  261. savings post-Earth flyby is possible based on delta DOR data. The delta
  262. DOR data analysis is in process and is expected to be available around
  263. January 22.
  264.  
  265.      The AC and DC bus imbalance measurements continued to fluctuate.  On
  266. January 9, the AC imbalance reached 48.4 volts indicative of a near "hard"
  267. short to spacecraft chassis.  The measurement remained stable for several
  268. hours and subsequently dropped to about 40 volts. During this time while
  269. the AC measurement fluctuated upward, the DC imbalance measurement very
  270. slowly crept upward to 20.8 volts and remained stable (see Special Topic).
  271.  
  272.  
  273. UPLINK GENERATION/COMMAND REVIEW AND APPROVAL
  274.  
  275.      The Project reviewed and approved the EV-6 Profile Design on January
  276. 12.  EV-6 contains the Venus Encounter Sequence which starts one day before
  277. the Venus closest approach and eight days later.  Venus science data will be
  278. recorded on the Data Management Subsystem (DMS).  The equivalent of four
  279. images will be returned using a technique incremental playback involving
  280. transfer of small portions of recorded science data to the CDS then reading
  281. out CDS memory.
  282.  
  283.      This process will be done while the telecommunications leak is capable
  284. of supporting the 1200bps downlink. Sequence and command generation starts on
  285. January 15.
  286.  
  287.      The Project approved the VE-1 and VE-2 Cruise Plans on January 11.
  288. These sequences will cover spacecraft activities from February 19 to March 26
  289. and from March 26 to April 23, respectively.
  290.  
  291.  
  292. SPECIAL TOPIC
  293.  
  294.      The fourth Tiger Team status report to the Project was held on January
  295. 10.  Three major topics were covered. PPS reported that after careful review
  296. of the inverter physical layout by LORAL engineers, it was concluded that
  297. the physical spacings between AC and DC functions is large (approximately
  298. 30-100 mils) and that the "touching" of AC and DC power lines is very unlikely.
  299. PPS will continue its effort to find any spacecraft event correlations with
  300. the observed imbalance measurements.
  301.  
  302.      Review of the Spin Bearing Assembly slip ring physical layout revealed
  303. that there are several locations within the four modules where AC or DC or
  304. grounds are adjacent. To determine the feasibility of a slip ring leakage
  305. path, an intensive effort was initiated two weeks ago to develop a model.
  306. The preliminary work to date indicates that it may be possible for small
  307. particles of silver (less than 30 microns) to move under the influence of
  308. electrostatic forces (causes by electric field gradients between adjacent
  309. slip rings) and deposit across the barrier thereby creating a leakage path.
  310. Work will continue on this model to refine the electrodynamic forces and to
  311. generate two dimensional AC and DC electrostatic field diagrams.
  312.  
  313.      Work has continued to determine the feasibility whether electrical noise
  314. may be corrupting PPS sensor readings. Noise coupling models have been
  315. developed and some stray current paths identified.  Since stray currents may
  316. produce erroneous readings in the PPS sensors, a careful review of all
  317. spacecraft electrical loads is in process. Noise currents on the orbiter of a
  318. few milliamperes may be sufficient to create anomalous readings.
  319.  
  320.  
  321.      The Project conducted a detailed review of its readiness and risk for
  322. Venus Science. Assessments were provided by the OET, Sequence and Navigation
  323. Teams of the Engineering Office; the Science Requirement and Ops Planning
  324. Team representing the Science and Mission Design Office, the Flight Control
  325. and Support Office and the Ground Systems Office.  It was concluded that the
  326. Venus Science encounter can be executed, in general, without adverse risk to
  327. the spacecraft; the Flight Team is staffed and trained though there is no
  328. margin in the development of the sequence. We are "GO" for Venus Science.
  329.  
  330.  
  331.  Ron Baalke                       |    baalke@mars.jpl.nasa.gov 
  332.  Jet Propulsion Lab  M/S 301-355  |    baalke@jems.jpl.nasa.gov 
  333.  4800 Oak Grove Dr.               |
  334.  Pasadena, CA 91109               |
  335.  
  336. ------------------------------
  337.  
  338. Date: 12 Jan 90 15:32:47 GMT
  339. From: hpfcso!hplisa!hpislx!gvg@hplabs.hpl.hp.com  (Greg Goebel)
  340. Subject: Any NASA COBE Personnel Out There?
  341.  
  342. I was making notes from the recent SCIENTIFIC AMERICAN article on COBE
  343. when I looked through the "Instrument Parameters" table, under the entry
  344. "Spectral Resolution" for FIRAS:
  345.  
  346.    0.2 cm^-1
  347.  
  348. I must've stared at that for five or ten minutes.  Either that's a typo or
  349. I'm missing something.  Any illumination out there?
  350. --
  351. +----------------------------------------------------------------------------+
  352. | Greg Goebel                             NET:     gvg@hpislx                |
  353. | Hewlett-Packard                         HP DESK: GREG GOEBEL / HP0900 / EM |
  354. | MSO Marketing                           PHONE:   Telnet/303 679-3424       |
  355. | POB 301 / MS-CU312 / Loveland CO 80539  FAX:     Telnet/303 679-5957       |
  356. +----------------------------------------------------------------------------+
  357.  
  358. ------------------------------
  359.  
  360. Date: 13 Jan 90 23:09:27 GMT
  361. From: microsoft!davidle@uunet.uu.net  (David LEVINE)
  362. Subject: Re: Nuclear Reactors in Space
  363.  
  364. >something useful well past this point.  And just how do you power the
  365. >proposed TAU (Thousand Astronomical Unit) project?
  366.  
  367. One configuration I (briefly) worked on used an SP-100 (that space 
  368. qualified reactor we've been talking about). 
  369.  
  370. >The engineers at NASA might be a bit slothful, but they aren't entirely dim,
  371.  
  372. Thanks for the qualifier.
  373.  
  374. >unlike the Sun at the majority of planets.
  375.  
  376. Which planets?  Which sun? 8-#:-)
  377.  
  378. David Levine
  379.  
  380.  
  381. =====================================================
  382. === The opinions expressed above are entirely mine ==
  383. === The facts expressed above are probably wrong   ==
  384. =====================================================
  385.  
  386. ------------------------------
  387.  
  388. End of SPACE Digest V10 #425
  389. *******************
  390.